Aittokoski was designed by architect Aarne Ervi and built soon after Ämmä Hydropower Plant by Oulujoki Power Company and the construction lasted from 1958 to 1960. It is the largest of the three power plants in the River Emäjoki and has a capacity of 45 megawatts.

The construction of the forebay required large scale earth moving works. Because of the composition of the soil, as in Montta, the Icos Veder -method had to be utilized to condense the ground. The construction site also dictated the overall composition of the power house. In Aittokoski the power house is built in a 30 metres deep chasm inside the bedrock, which gives the building its vertical, tower-like, shape and also dictates its program. Aittokoski is the only power plant where the draft tube runs completely underground while the gate room is located up on the same level as the head water. Aittokoski is also the only power plant where the inflow is controlled by a radial gate. Despite the challenging construction site, Ervi was able to bring natural light into the building, using the openness of the interior space and carefully placed windows and reflecting surfaces.

The program of the power house is composed around the machine hall that sits at the bottom floor. The service level is built as a mezzanine that circles the machine hall bay. Spiral staircase leads up to the shallow gate room on the upper floor. The offices and control rooms are located below the service level. Black and white -striped clinker tile on the floor and the dramatic blue and yellow dominate the appearance of the interior, while the generator is painted red. Ervi also refined the interior with structural details like the corbels supporting the beams above.

The building’s on-site casted concrete frame was completely cladded with profiled aluminium sheeting giving it a drastically different appearance from Ervi’s other power houses. An additional concrete framed service space was built on the eastern side of the power house while the concrete structured log crane and the regulating dam are located on the western side of the power house. The combination of aluminium and concrete gives the facility a striking and powerful industrial appearance. The verticality of the building can only be realized by viewing the building from the deep canyon where the tailrace runs. This is a dramatic difference compared to the view from the forebay, where the whole facility is barely visible.

Text: Samuli Paitsola

Location

Aittokoskentie 45-47, Suomussalmi
64.8364584, 28.85048

Images

View from south, Aittokoski Hydropower Plant
View from south, Aittokoski Hydropower Plant (© Council of Oulu Region / Pekka Elomaa 2019)
View from southwest, Aittokoski Hydropower Plant
View from southwest, Aittokoski Hydropower Plant (© Council of Oulu Region / Pekka Elomaa 2019)
View from spillway opening to lower channel, Aittokoski Hydropower Plant
View from spillway opening to lower channel, Aittokoski Hydropower Plant (© Council of Oulu Region / Pekka Elomaa 2019)
Spillway opening, Aittokoski Hydropower Plant
Spillway opening, Aittokoski Hydropower Plant (© Council of Oulu Region / Pekka Elomaa 2019)
Spillway opening in 1960, Aittokoski Hydropower Plant
Spillway opening in 1960, Aittokoski Hydropower Plant (© Fortum Power and Heat Oy / FotoRoos)
View from west  in 1963, Aittokoski Hydropower Plant
View from west in 1963, Aittokoski Hydropower Plant (© Fortum Power and Heat Oy / FotoRoos)
Machine hall, Aittokoski Hydropower Plant
Machine hall, Aittokoski Hydropower Plant (© Council of Oulu Region / Pekka Elomaa 2019)
Machine hall, Aittokoski Hydropower Plant
Machine hall, Aittokoski Hydropower Plant (© Council of Oulu Region / Pekka Elomaa 2019)
Gate room, Aittokoski Hydropower Plant
Gate room, Aittokoski Hydropower Plant (© Council of Oulu Region / Pekka Elomaa 2019)
Gate room in 1960, Aittokoski Hydropower Plant
Gate room in 1960, Aittokoski Hydropower Plant (© Fortum Power and Heat Oy / FotoRoos)
Site plan, Aittokoski Hydropower Plant
Site plan, Aittokoski Hydropower Plant (© Fortum Power and Heat Oy / FotoRoos)

More projects by author

Empty placeholder image
Bookmark

Villa Koivikko

  • Espoo
Empty placeholder image
Bookmark

Ämmä Hydropower Plant

  • Suomussalmi
Empty placeholder image
Bookmark

Seitenoikea Hydropower Plant

  • Ristijärvi
Empty placeholder image
Bookmark

Montta Hydropower Plant

  • Muhos
Empty placeholder image
Bookmark

Nuojua Residential Area

  • Vaala
Empty placeholder image
Bookmark

Jylhämä Hydropower Plant

  • Vaala
Empty placeholder image
Bookmark

Nuojua Hydropower Plant

  • Vaala
Empty placeholder image
Bookmark

Utanen Hydropower Plant

  • Utajärvi
Empty placeholder image
Bookmark

Pälli Hydropower Plant

  • Muhos
Empty placeholder image
Bookmark

Leppiniemi Residential Area

  • Muhos
Empty placeholder image
Bookmark

Pyhäkoski Hydropower Plant

  • Muhos
Empty placeholder image
Bookmark

Jylhämä Residential Area

  • Vaala
Empty placeholder image
Bookmark

Tapiola Central Tower

  • Espoo
Empty placeholder image
Bookmark

Tapiola Swimming Hall

  • Espoo
Empty placeholder image
Bookmark

University of Turku Main Campus

  • Turku
Empty placeholder image
Bookmark

Oulujoki Power Plants and Communities

  • Muhos
Empty placeholder image
Bookmark

Lohja Parish Hall

  • Lohja
Empty placeholder image
Bookmark

Voimatalo Office Building

  • Helsinki
Empty placeholder image
Bookmark

Töölö Library

  • Helsinki
Empty placeholder image
Bookmark

Helsinki University Porthania Building

  • Helsinki

Nearby projects

Empty placeholder image
Bookmark

Ämmä Hydropower Plant

  • 5.7 km
Empty placeholder image
Bookmark

Seitenoikea Hydropower Plant

  • 34.1 km
Empty placeholder image
Bookmark

Watermills in Kainuu Region

  • 36.1 km